Home
  Dual Pier System
  Causes
  Warning Signs
  Contact

Dual Pier System

We dig holes every 6’ around the perimeter of your structure, we then push dual piers to jack-resistant sub-strata. Then we raise and re-level your structure permanently. We drive steel shims at the bottom of your foundation. We then fill the holes in and pre-sink each one with water, then we leave the top mounded approximately 3” so it will push any water (rain or sprinklers) away from your foundation to correct any drainage problems you may have.


Cylinder Construction: 6” Diameter, 12” Height, max psi 6000 each.